Riverside East Rotary is proud to share that Toilets 4 Life Phase II has launched in Bugiri Municipality, Uganda. Five modern sanitation facilities are now serving schools, markets, and public spaces across the municipality, backed by two purpose-bought trucks and a wastewater treatment technology new to the district.

Phase II is funded through Global Grant #2569338, a $206,248 partnership between the Rotary Club of Bugiri Municipality (District 9213) and Riverside East Rotary District 5330, and Rotary International.

Front view of a completed Toilets 4 Life Phase II sanitation block with a red roof and painted Rotary signage
A completed Toilets 4 Life Phase II sanitation block in Bugiri Municipality.

Why Bugiri

Bugiri Municipality is home to roughly 45,650 people. Before this work began, 76% of them had no access to safe water, and the entire municipality was served by three public pit latrines, two of which no longer worked. There is no municipal sewage system. The consequences show up as cholera, typhoid, and dysentery, and they fall hardest on women, girls, and children under five.

Phase I of Toilets 4 Life began addressing this in 2023 and Phase II builds on it.

What Phase II built

Five sanitation facilities, at:

  • Bugubo Primary School
  • Nabukalu Market
  • ITT Vocational Training Centre
  • Bugiri Bus Park
  • Kireka-Ndifakulya community

Each facility includes six stances (two for women, two for men, one for persons with disabilities, and one urinal), along with two shower units, tap-water connections, and handwashing stations.

Gable end of a completed facility painted with Toilets for Life Project, Funded by Rotary, GG No. 2569338
Painted signage credits Rotary, RC Bugiri Municipality and Riverside East Rotary.

Two trucks, both already in weekly service:

  • A 10,000-litre cesspool emptier (Reg. UA 375BP), which empties school and public toilets and carries the waste for proper disposal.
  • An ISUZU FORWARD garbage collection truck (Reg. UA 018DP), now running weekly refuse collection across Bugiri Municipal Council, with communities loading the garbage themselves as their contribution to the project.

Two Aquonic wastewater treatment tanks, purchased in Bangkok, Thailand and shipped to Uganda. Rather than simply storing waste until a truck can collect it, these tanks treat wastewater on site, a technology not previously available in the municipality.

More than construction

Training. Twenty-five WASH school committee members, facility cleaners, and garbage and cesspool staff completed a two-day hygiene, sanitation and wastewater management course in December 2025. A further 20 participants were trained specifically on Aquonic tank operation and maintenance by Attawut Kumkronng of SCGC Thailand, working alongside ITT Vocational Training Centre.

The curriculum also included WASH committee roles and responsibilities, the relationship between water, sanitation and waterborne infection, menstrual hygiene management, solid waste collection and disposal, and Uganda’s sanitation regulatory framework.

Community ownership. Community adoption meetings were held on 10 January 2026, and School WASH Committees have been established and trained at every site. Hygiene education programs are running across all beneficiary schools.

Getting the word out. A radio talk show on Eastern Voice Radio in Bugiri brought the project to the wider community, with the Mayor’s representative Mr. Mapesa Ayub taking part alongside visiting Rotarians.

Supporting Organizations

Rotary Club of Bugiri Municipality hosts the grant, under President Nabba Charles and Charter President Proscovia Biryeri. Jaffer Bajja Shaban serves as project administrator and has driven implementation and reporting throughout, as he did in Phase I.

ITT-Africa School of Health Science, Technology and Innovation is the cooperating organization, leading community mobilization, training delivery, and reporting.

Riverside East Rotary is the international sponsor. Club member Rtn. Zubair Bakubye travelled to Uganda, addressed the community adoption meetings, took part in the radio talk show, and helped facilitate the Aquonic tank training.

Rotary Club of Murrieta sent Rtn. Nancy Young, Rtn. Doreen Tate, and Rtn. Mickie Evans, who travelled to Bugiri and facilitated the January community meetings and the radio broadcast.

Rotary Club of Jinja has mentored the Rotary Club of Bugiri Municipality since its founding, with Rtn. Petronilla serving as mentor. That sustained support made a club capable of hosting a grant of this size.

From Phase I to Phase II

Phase I (Global Grant #1985875) brought $61,500 to Bugiri and delivered five basic septic toilet blocks and one 7,500-litre cesspool truck. It was hosted by the Rotary Club of Iganga and completed in 2023.

Phase II is more than three times the size, at $206,248, with larger and more inclusive facilities, a second truck for solid waste, and on-site wastewater treatment. The host club changed to Bugiri Municipality’s own Rotary club, a sign of how much local capacity has grown in three years.

Read more about the Toilets 4 Life project and its Phase I updates.

What it’s already changing

Reported results so far:

  • Thousands of people directly benefiting
  • Improved access to safe and dignified sanitation
  • Reduced congestion and unsafe toilet use in schools
  • Increased school attendance, particularly among girls
  • Greater community awareness of hygiene practices
  • Local ownership strengthened through active WASH Committees

The project’s goal is to reduce waterborne disease in the municipality by at least 50%.

What’s next

A cadre visit is planned, and District 5330 is exploring a Vocational Training Team (VTT) to Bugiri, an opportunity to deepen the technical partnership well beyond the life of the grant.

Two things learned during Phase II are shaping what comes after. Menstrual hygiene bins were not in the original budget but proved essential, and were provided anyway. And Bugiri’s sludge treatment capacity has become the limiting factor: the municipality currently relies on a lagoon originally built to serve Bugiri Hospital, which is not sized for municipal demand and is approaching capacity. The Municipal Council has requested a dedicated lagoon, and without one, the long-term sustainability of the sanitation system is at risk.

Thank you

The Rotary Club of Bugiri Municipality has expressed its gratitude to The Rotary Foundation, and to the clubs and districts whose funding and technical support made Phase II possible. Riverside East Rotary is grateful in turn to everyone who has supported Toilets 4 Life across both phases.

Launch day

Two project leaders walking across grass toward the launch site at sunset
Arriving at the launch site.
Five officials standing in the doorway of a newly built sanitation facility
Officials inspect a new facility on launch day.
Officials and community members gathered outside a new sanitation facility, several filming on phones
Community members turned out in numbers for the launch.
Two women carrying the ceremonial ribbon and scissors past the ISUZU garbage truck
Preparing for the ribbon cutting.
Rotarians and officials standing in front of the T4 Life garbage collection truck, decorated with balloons
The new garbage collection truck, dressed for its handover.
Rotarians and officials posed in front of the T4 Life garbage truck at the launch ceremony
Rotarians and municipal officials at the handover.
A line of officials in front of the T4 Life garbage truck and cesspool emptier, with children watching
Both trucks, garbage collection and cesspool emptier, on display.
Officials standing together in front of the T4 Life trucks at sunset
Officials with the two new vehicles.
An official addressing attendees in front of the project trucks
Remarks to the gathering.
Dignitaries seated under a marquee during the launch ceremony
Guests seated for the formal programme.
Large group of Rotarians, officials and community members photographed in front of the project trucks
Attendees gather for a group photograph.
Wide group photograph of launch attendees in front of the garbage truck and cesspool emptier
A wider view of the same group.
Attendees and community members gathering around the trucks during the launch
The crowd closes in around the trucks.

The completed facilities

Wide view of a completed sanitation block with its doors open
A finished six stance block.
Visitors walking past the open entrance of a completed sanitation facility
The facility in use.
A man entering the doorway of a completed Toilets 4 Life sanitation facility
Going in.
Visitors standing beside the gable end of a completed sanitation facility
Inspecting a finished block.

Video from the launch

Cutting the ribbon at a new facility.
Cutting the ribbon on the cesspool emptier.
Handover speech at the trucks.
Remarks at the wastewater tank.
Remarks at the garbage truck.
The project signboard on the truck.
Officials arriving at the venue.
Walking to the ceremony.

Project presentation

The full Phase II project presentation, compiled by project administrator Jaffer Bajja Shaban, is available here: Toilets for Life Phase II Project Presentation (PDF).

Share: